TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
09/03/2019
03:42:20 PM
09/04/2019
09:00:00 AM
88180
Initiate
Capacity Constraint
09/03/2019
03:42:20 PM


No response required


Somerset to Summerfield 36" Line 65 ILI Tool Run -- UPDATE


Notice Text:


The previously posted Somerset to Summerfield 36" Line 65 tool run originally scheduled for September 4 has been canceled and is now rescheduled for September 25. All restrictions associated with this outage for Gas Day September 4, 2019 have been lifted.


***Somerset to Summerfield 36" Line 65
Caliper & ILI Tool Runs: September 25
Potential Repair Beginning On: TBD
Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 36" Line 65, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 350,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.


In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, the following meter may experience lower than normal pressure or be unavailable for low:

70062 - NAT GAS & OIL - SOMERSET, OH

Additionally, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.


Please contact your Operations Account Representative should you have any questions.