Close WindowPrint
TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
006951446
Algonquin Gas Transmission, LLC
Critical notice
07/11/2019
09:00:00 AM
07/17/2019
09:00:00 AM
86259
Initiate
Capacity Constraint
07/10/2019
09:16:22 AM


No response required


AGT Notification of a Planned Outage by Texas Eastern


Notice Text:

Algonquin Gas Transmission (AGT) has been informed by Texas Eastern (TE) of the following outage below which will impact deliveries to TE on its Leased Capacity on AGT:

Lambertville to Linden Line 24" 20B:
Pipeline Outage Dates: July 11 - July 19
Caliper and ILI Tool Run: July 16
Potential Repair Beginning On: September 23
Potential Run Comp Repair Beginning On: October 23

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be a conducting in-line inspection tool run on Lambertville to Linden Line 24" 20-B. During this outage period of July 11 - July 19, the following restrictions will be necessary:

1.The following meter will be unavailable for flow:

73062 - ELIZABETHTOWN GAS COMPANY - UNION CO., NJ

2.Net receipts into TE will be limited to approximately 350,000 Dth/d cumulative from interconnects with Algonquin Gas Transmission at the following meters:

70087 - ALGONQUIN - LAMBERTVILLE, NJ
76087 - ALGONQUIN - LAMBERTVILLE, NJ (RECEIPT)
71078 - ALGONQUIN - HANOVER, NJ
78200 - AGT Mainline (NJ-NY)
78201 - MAHWAH
78214 - RAMAPO

Based on the current level of nominations, TE anticipates restrictions to interruptible and secondary out of path, secondary in path and primary firm nominations.


In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, worst case scenarios are as follows:

1.The following meter may unavailable for flow:

73062 - ELIZABETHTOWN GAS COMPANY - UNION CO., NJ

2.Net receipts into TE may be restricted to a low of approximately 350,000 Dth /d cumulative from interconnects with Algonquin Gas Transmission, which includes receipts on the TE/AGT Lease.

70087 - ALGONQUIN - LAMBERTVILLE, NJ
76087 - ALGONQUIN - LAMBERTVILLE, NJ (RECEIPT)
71078 - ALGONQUIN - HANOVER, NJ
78200 - AGT Mainline (NJ-NY)
78201 - MAHWAH
78214 - RAMAPO




Close WindowPrint