Effective Date: 10/1/2020
BackPrint
Shipper NameShipper IDShipper Affiliation IndicatorRate ScheduleContract NumberContract Effective DateContract Primary Term Expiration DateDays Until Next Possible Contract ExpirationNegotiated Rates IndicatorFor Transportation, Max Daily Quantity
(Dth)
For Storage, Max Daily Quantity
(Dth)
Footnote ID
THE NARRAGANSETT ELECTRIC COMPANY D/B/A NATIONAL GRID1193655NAFT-19B105-R51/1/202010/31/20210N569304/46

Point Identifier CodePoint NamePoint Identification Code QualifierPoint Identification CodeZone NameFor Transportation Maximum Daily QuantityFor Storage, Maximum Daily QuantityFootnote ID
MQNATIONAL GRID-DEY ST. (PROVIDENCE,R9500004AGT28390
MQNATIONAL GRID-WESTERLY (WASHINGTON,9500008AGT530
MQNATIONAL GRID- PORTSMOUTH (NEWPORT,9500013AGT28010
M2ALGONQUIN - LAMBERTVILLE, NJ9500210AGT56930
MQG-12 SYSTEM G-5 MAINLINE9580071AGT28390

Footnote NumberFootnote Text
4Original contract effective date: 06/01/1993
46Varying MDQ quantities as follows: 5693 dth - Oct 1-Nov 15, 8539 dth - Nov 16-Apr 15, 0 dth - Jun 1-Sep 30, 5693 dth - Apr 16-May 31